Budget cosmetic refresh of a 40 sq ft guest bathroom
Budget vanity, fixtures, and flooring; new tile on the floor only; no plumbing moves and no accessibility work.
$5,490–$26,180Typical duration: 2–4 weeks
ESTIMATEComputed by the shared estimate engine from the national cosmetic refresh baseline ($7,500–$28,000, sourced at a 50 sq ft reference); scaled to 40 sq ft on the sub-linear size curve (exponent 0.2); quality adjustments applied (budget vanity, budget fixture, budget flooring); no local price parity index applies at national level, so the range is widened ×0.9 low / ×1.15 high.
What moved this range
- Room size — 40 sq ft, versus a roughly 50 sq ft reference bathroom for this scope.
- Vanity quality — Vanity quality set to "budget".
- Fixture quality — Fixture quality set to "budget".
- Flooring quality — Flooring quality set to "budget".
- No local cost index — No sourced construction-cost index exists for this metro, so the range is widened and left as unadjusted national data.
Baseline sources: st.hzcdn.com, thisoldhouse.com, trusselltransforms.com, thisoldhouse.com